Planning for Clean Water Needs in ITP Main Building

Authors

  • Sulaeman Institut Teknologi Padang
  • Ikhsan Arif Institut Teknologi Padang

DOI:

https://doi.org/10.21063/jtm.2022.v12.i1.82-91

Keywords:

clean water, plumbing system, building, pump power, pipe planned

Abstract

Plumbing system planning is an important part of a building to meet clean water needs. This study aims to plan a plumbing system for clean water in the ITP main building. Meeting the needs of clean water is planned to use water sources from shallow wells that are pumped into the roof tank (roof tank) and flowed gravitationally to pump two. The results of the calculation of the average water requirements of office buildings are 53 liters / day. The capacity of the roof tank needed to accommodate clean water is 2,100 liters, using two roof tanks with a capacity of 1,050 liters each. Roof tanks are placed on top of towers as high as 7.15 m. The diameter of the clean water pipe needed is 20-50 mm. The pump power needed is 0.071 kw and for the second pump is 0.63 kw. The type of pipe planned for this clean water plambing system is Polyvinyl Chloride (PVC) pipe.

References

H. Tahara dan Sularso, 2000, Pompa dan Kompresor. Jakarta: PT. Pradaya Paramita.

F. Dietzel, 1996. Turbin Pompa dan Kompresor. Aih Bahasa Dakso Sriyono. Jakarta: Erlangga.

T.P. Hertanto, 2013. Sistem Pemipaan. Jakarta: Universitas Mercubuana Fakultas Teknik.

Y. Sirawan, 2000. Sistem Pemipaan. Surabaya: Universitas Negeri Surabaya.

Y. Kusuma, 2014. Perancangan Sistem Plumbing, Jakarta: Universitas Mercu Buana.

J. Affiandi, K. Pharmawati & A. Nurprabowo, 2016, Perencanaan Sistem Instalasi Plambing Air Bersih Gedung Hotel Tebu. Jurnal Online Institut Teknologi Nasional, 4(2), 1–9.

K. Catur, B. Artayana & G. Indra, 2010, Perencanaan Instalasi Air Bersih dan Air Kotor Pada Bangunan Gedung dengan Menggunakan Sistem Pompa. Jurnal Ilmiah Teknik Mesin, 4(1), 51–56.

S. Kasus, H. Baru, K. Samarinda, S. Nugroho, I. Meicahayanti & J. Nurdiana, 2018, Analisa Jaringan Perpipaan Distribusi Air Bersih, 39(1), 62–66. https://doi.org/10.14710/teknik.v39n1.15192

A. Riyanti & N.W. Saputra, 2018, Perencanaan Sistem Plambing Air Bersih dan Air Buangan Gedung SMK Negeri 3 Kota Jambi, 1(1), 35–40.

Ubaedilah, 2016, Analisa Kebutuhan Jenis Dan Spesifikasi Pompa Untuk Suplai Air Bersih Di Gedung Kantin Berlantai 3 Pt Astra Daihatsu Motor. Jurnal Teknik Mesin, 5(3), 119–127. Retrieved from https://media.neliti.com/media/publications/177037-ID-analisa-kebutuhan-jenis-dan-spesifikasi.pdf

Downloads

Published

2022-04-30

How to Cite

Sulaeman, & Arif, I. (2022). Planning for Clean Water Needs in ITP Main Building. Jurnal Teknik Mesin, 12(1), 82–91. https://doi.org/10.21063/jtm.2022.v12.i1.82-91